• Kyodo

  • SHARE

Kyushu Electric Power Co. said Wednesday it has decided to scrap its aging No. 2 reactor at its Genkai nuclear plant in Saga Prefecture.

The utility abandoned a plan to restart the unit, which has an output of 559 megawatts, in the face of the huge costs involved in enhancing the safety of the reactor that is already near the end of its 40-year operating life.

In a time of both misinformation and too much information, quality journalism is more crucial than ever.
By subscribing, you can help us get the story right.

SUBSCRIBE NOW

PHOTO GALLERY (CLICK TO ENLARGE)